3. OPERATION
INCANTO S-CLASS
Page 12/21
REV.1 FEB.2005
Saeco International Group
Display indicators
Press MENU/OK button.
Descale machine.
Fill water tank with fresh drinking water.
Fill coffee beans container and re-start coffee dispensing cycle.
Open the doors, remove the grinds container and empty.
Important: The grinds container must only be emptied when the machine is turned on. The
container must be removed for at least 5 sec. If the grinds container is emptied when the machine
is turned off, coffee dispensing will be locked when the machine is turned on.
Install brewing unit correctly.
Install drip tray and coffee grinds container correctly.
Close front door.
Prime the circuit (start-up).
Call authorised service centre.
Call authorised service centre.
The machine is in the heating stage; wait until this stage is
complete.
Standby
Descaling
Standby
Brewing unit locked
Ventilate
Fill water tank
Bean less
Ready
Empty the dregs
drawer
Brewing unit not
detected
Dregs drawer not
detected
Close doors
Rinse
Heat
Grinder locked
Summary of Contents for RI9722/11
Page 2: ......
Page 4: ......
Page 6: ......
Page 8: ......
Page 12: ......
Page 16: ......
Page 38: ......
Page 40: ......
Page 50: ......
Page 52: ......
Page 71: ...Saeco International Group REV 1 FEB 2005 CHAPTER 6 FAULTS Page 1 Faults 1 ...
Page 72: ......
Page 74: ......
Page 78: ......
Page 108: ......
Page 109: ...Saeco International Group REV 1 FEB 2005 CHAPTER 9 CIRCUIT DIAGRAMS ...
Page 110: ......
Page 112: ......
Page 114: ......
Page 116: ......
Page 120: ......
Page 124: ......
Page 126: ......
Page 144: ......
Page 158: ......
Page 160: ......
Page 172: ......
Page 173: ...Saeco International Group REV5 FEB 2005 CHAPTER 6 FAULTS Page 1 Faults 1 ...
Page 174: ......
Page 178: ......
Page 180: ......
Page 188: ......
Page 190: ......
Page 222: ......
Page 223: ...Saeco International Group REV5 FEB 2005 CHAPTER 10 CIRCUIT DIAGRAMS ...
Page 224: ......