![background image](http://html1.mh-extra.com/html/saeco/ri9722-11/ri9722-11_service-manual_4147128164.webp)
5. SERVICE PROGRAMME
INCANTO
Page 4/11
REV.5 FEB.2005
Saeco International Group
Function
Setting range
Increment
Comments
TEMP. INCREASE
° C 10
0-50°C
+/-1
The boiler temperature is
increased by a set value shortly
before brewing in order to pre-
heat the boiler and compensate
for the temperature drop during
the first water flow.
PRE-BREWING
1
0 – 1
0 – Deactivate pre-brewing
1 – Activate pre-brewing
GRINDS COUNTER
Number
0-50
+/-1
Counts number of coffee cycles.
When this value reaches the
Grinds Stop value, "GRINDS
CONTAINER EMPTY" will be
displayed. (Reset by removing
dregs drawer for emptying within
a min. of 6 sec.)
GRINDS MAXIMUM
13
5-50
+/-1
Number of cycles until "EMPTY
GRINDS CONTAINER" is
displayed.
--TOTAL COFFEE--
CYCLES Number
---------------------
-----------------------
Total of all coffee cycles, cannot
be reset.
--TOTAL WATER--
(ml) Number
---------------------
-----------------------
Total water flow volume (in ml) /
not resettable
WATER DESCALING
(ml)
---------------------
-----------------------
Total water flow (in ml) since last
descaling / resettable.
HOT WATER
FLOW (l/h) 20
6 - 34 1/h
+/- 2 1/h
The
pump delivery rate
for hot
water can be expressed in litres
per hour.
--HOT WATER---
PUMP ADJUST. 63000
58,000 - 65,500
+/- 1
The pump delivery rate is adjusted
in relation to the HOT WATER
FLOW setting by means of a
phase controlled modulator. Pump
tolerances can thus also be
adjusted. An equivalent value is
saved under HOT WATER PUMP
ADJUSTMENT.
WATER HARDNESS
3
1 – 4
Value set in user menu for
descaling interval
MACHINE STATUS
128
0 – 255
Programme code
Summary of Contents for RI9722/11
Page 2: ......
Page 4: ......
Page 6: ......
Page 8: ......
Page 12: ......
Page 16: ......
Page 38: ......
Page 40: ......
Page 50: ......
Page 52: ......
Page 71: ...Saeco International Group REV 1 FEB 2005 CHAPTER 6 FAULTS Page 1 Faults 1 ...
Page 72: ......
Page 74: ......
Page 78: ......
Page 108: ......
Page 109: ...Saeco International Group REV 1 FEB 2005 CHAPTER 9 CIRCUIT DIAGRAMS ...
Page 110: ......
Page 112: ......
Page 114: ......
Page 116: ......
Page 120: ......
Page 124: ......
Page 126: ......
Page 144: ......
Page 158: ......
Page 160: ......
Page 172: ......
Page 173: ...Saeco International Group REV5 FEB 2005 CHAPTER 6 FAULTS Page 1 Faults 1 ...
Page 174: ......
Page 178: ......
Page 180: ......
Page 188: ......
Page 190: ......
Page 222: ......
Page 223: ...Saeco International Group REV5 FEB 2005 CHAPTER 10 CIRCUIT DIAGRAMS ...
Page 224: ......