page 60
May 01/2007
Effectivity: 912 Series
Edition 1 / Rev. 0
d04054
INSTALLATION MANUAL
BRP-Rotax
09126
LOCTITE
®
603
Ø 6mm (0. 236 in)
05294
05295
3
2
2
11,5mm
(0.453 in)
Ø
6
(0.236 in)
mm
Ø
3
(0.118 in)
mm
Ø
6
(0.236 in)
mm
1 2 3
4
5
05033
Fig. 31
Fig. 32
Fig. 33
Fig. 34
-
Unscrew cap (2) from the overflow bottle.
-
Bore the existing vent hole from dia. 1mm (0.04 in.) to dia. 6mm (0.236 in.)
-
Apply LOCTITE
®
603 to the threads of the hose nipple (3).
-
Insert nipple (3) into the vent hole.
-
Install nut (1) onto the hose nipple (3). Tightening torque 5 Nm (44 in lb).
-
Screw the cap onto the overflow bottle.
Steps to attach the hose:
-
Attach the hose with a gear-type hose clamp (4).
-
Make sure the hose (5) has no kinks. Route it overboard and secure.
1