
Effectivity: 912 Series
Edition 1 / Rev. 0
d04060
page 133
May 01/2007
BRP-Rotax
INSTALLATION MANUAL
22) Preparations for trial run of engine
▲
WARNING:
Prior to engine start and operation review all instructions stated in the
Operators Manual.
Conduct test run:
See Operators Manual 912 section 10.3
Verification of the throttle lever detent for max. continuous power:
Performance check in accordance with Operators Manual.
If nominal performance won't be reached or is in excess of, examination of the
installation and engine will be necessary. Consult Maintenance Manual 912.
■
CAUTION:
Don't conduct any test flights before fault has been traced and found.