Galaxy
®
GHDX2-ADA DICOM Storage and Archive Appliance Admin Guide
17
Phase One - Preparing the Hardware for Use
Unpacking Instructions
Inspect the box for shipping damage: If the shipping container is damaged, notify the
shipper immediately. Any delay in notification could result in claim loss.
Prior to opening the box, move the box as close to the unit’s installation site as possible.
Remove the appliance from the plastic wrap and inspect it carefully to ensure that no parts
are missing or any damage has occurred during shipping.
Equipment Requirements Needed for Installation
The unit requires:
•
One 115 volt or 230 volt A.C. outlet
•
An open network port
•
A static or DHCP assigned IP address
•
An administrator login and password if installing in a domain
•
If a local connection is desired, a keyboard and monitor will be required
•
Ethernet cable
Package Contents
Before beginning the installation, first verify that all the necessary components were
included in the box.
Refer to this Guide for the content list and installation instructions.
1.
Box contents:
•
System
•
Power cable
•
Documentation
For International Customers: Ensure that the correct power adaptor for the Appliance is
used (the plug included may be for North American outlets).