4801-5164J
20 October 2021
10
RS-500 5K Walk-In Cooler Door Installation and Operation Manual
Section 2: Installation
Read this manual in its entirety before beginning the procedure. Inspect the contents of the shipping crate for damaged, loose, or
missing components. If any components are damaged, loose, or missing, contact your RollSeal distributor immediately.
Section 2.1: Preliminary Steps
Installation Requirements
Door Size
Personnel
Equipment
Tools
PPE
Time
Up to 6’ W x 9’ H
2
Ladder
- Standard Hand Tools
(Drill, Wrenches, Level,
etc.
)
- 1” Hole Saw (for Switch)
- Glasses
- Gloves
- Boots
- Hard Hat
~ 1 Hour
Section 2.2: Adjust Framing and/or Clear Opening
1. Using the diagram on the following page, determine the required dimensions of the clear opening. If necessary, adjust the
dimensions of the mounting posts and/or framing members to suit the nominal dimensions of the door.
2. The framing material must provide adequate support for screws. Ensure the mounting posts and/or framing members are
positioned so the screw holes in the vertical tracks will align with them.
3. Allow at least 12" (ideally 18") of clearance above the head unit.
4. Allow at least 6" of clearance on the outside of each track.
5. Ensure the top screw holes in the head unit will overlap and fit flush with the framing.
6. Ensure the screw holes in the vertical tracks align with the framing. The predrilled screw holes in the inner and outer flanges
will serve as attachment points when the assembly is mounted.