Cleaning and Greasing
Chapter 3 Maintenance
37
Z-Axis
Move the spindle unit to its lowest position, and then thoroughly clean the screw.
P. 7, "Operation of the Spindle Unit"
Cleaning During an Extensive Cutting Operation (Only X-axis)
If cutting waste accumulates during an extensive cutting operation, the machine’s operation may be hindered,
resulting in a product that does not meet expectations. If you see cutting waste accumulating, pause the
cutting operation before the machine’s operation becomes hindered, and then remove the cutting waste
accumulating near the X-axis screw.
P. 26, “Pausing/Resuming/Stopping Cutting”
After pausing the cutting operation, remove the top cover, and then use the cleaning brush provided as an
accessory to remove any cutting waste.
Screw
Screw
Summary of Contents for iModela iM-01
Page 73: ...R2 111104 DOC 0943 ...