Copyright PSC
2000781K MkII MLB Operating Procedure
Page 3 of 68
Revision History
Rev
Issued
Created Reviewed Change Description
-
02Nov06
RW
RH
Initial document
A
to
J
11May07
to
17Jan19
Varies
Varies
See prior revisions for details.
K
30Oct20
RH
LB
1) Entire document: general formatting and grammatical improvements.
2) Section 1: added DB-9 description
3) Section 2.1: made this a section
4) Table 2-1: updated descriptions, added Mate operation, electrical
column and section references
5) Section 2.3: added this section
Table 2-3: added flatness and circularity equipment
6) Table 2-4: incorporated previous Preparing to Compress equipment,
added PSC equipment
7) Table 2-5: added video camera, increased recommended qty. of
several items for test circuits
8) Section 3: added adjoining structure attachment warning
9) Section 4: added support@ contact email
10) Section 5: added Sep Spring and Retaining Cord handling precautions,
added permitted flange contact
11) Section 6: added flatness and circularity recording, added reminder for
Sep Connector and Switch attachment
12) Section 7: incorporated prior section 12 (Preparing to Compress)
13) Section 7: used to be a part of the Stow section
14) Step 7.1.4: increased measurement locations from 4 to 6
15) Step 7.1.7: this step used to be later in the procedure
16) Sections 8, 9, 10: added several test circuits to account for the various
Lightband switch states. Used to be only one test circuit per operation.
17) Sections 8, 9, 10: added step checking DB-9 cleanliness prior to
Lightband attachment.
18) Sections 8, 9, 10: added step to remove power and measurement
circuit from Lightband after each operation.
19) Step 8.4.4: added rechecking pre-Stow distance
20) Table 8-1: updated allowable values
21) Table 8-2,Table 9-2,Table 10-2: moved to relevant sections, increased
OL resistance to match inspection report
22) Table 9-1: increased allowable time
23) Table 10-1: added note 2 permitting temporary switch reactivation
24) Figure 13-1: updated to include intermediate switch states and
operation directions
25) Section 16: added unintended electrical warnings.
26) Step 17.2.1: now references User Manual for LCT qty.
27) Section 17.5: added instructions to reverse the mate w/ LCTs