![ROCKET LAB PSC MOTORIZED Lightband MKII Operating Procedure Download Page 43](http://html1.mh-extra.com/html/rocket-lab/psc-motorized-lightband-mkii/psc-motorized-lightband-mkii_operating-procedure_1472596043.webp)
Copyright PSC
2000781K MkII MLB Operating Procedure
Page 43 of 68
Figure 9-4: Example Set-For-Flight voltage and current profiles at NTP
Table 9-1: Set-For-Flight electrical verification (values apply only at NTP)
Set-For-Flight Electrical Parameters
Item
Description
Units
Allowable
Measured
Min
Max
Motor A
Motor B
1
First peak current
A/mtr
1.05
1.70
2
Free-running current (average)
A/mtr
0.02
0.18
3
Post free-run current rise
A/mtr
0.20
1.70
4
Time to initially cut power (1,2)
s
1.00
1.35
1) It is acceptable for one motor to exceed the maximum allowable time to initially cut power.
2) Use the current channels to determine time.