Copyright PSC
2000781K MkII MLB Operating Procedure
Page 17 of 68
Figure 6-2: Inserting a SHC screw between Leaves on Lower Ring.
Figure 6-3: SHC screw and washer inserted between Leaves on elevated Lower Ring.
Figure 6-4: Separated Lightband halves attached to adjoining structures.