![ROCKET LAB PSC MOTORIZED Lightband MKII Operating Procedure Download Page 31](http://html1.mh-extra.com/html/rocket-lab/psc-motorized-lightband-mkii/psc-motorized-lightband-mkii_operating-procedure_1472596031.webp)
Copyright PSC
2000781K MkII MLB Operating Procedure
Page 31 of 68
8.4 Stow
Step
Procedure
Date & Initials
Tech.
QA
8.4.1
Verify the DB-9 pin connector of the
Stow Power and Measurement Circuit
in
is visibly clean. Any debris could detrimentally contaminate the
Lightband’s mating socket connector.
8.4.2
Connect the Lightband to the
Stow Power and Measurement Circuit
per Figure
. Do not apply power to the Lightband.
Figure 8-4: Stow circuit