30
ROBOVENT • SPIRE SERIES OWNER’S MANUAL
SECTION 600
Start-up/Commissioning
15. Set and record the hertz that the VFD is set at, if applicable.
a. The VFD will be set by using an airflow meter to measure and confirm the
velocity (FPM) and airflow (CFM) within the ductwork.
16. Check the measured velocity (FPM) and airflow (CFM) vs. the designed velocity (FPM)
and airflow (CFM).
17. Photos will be taken of the RoboVent Collector, RoboVent HMI, RoboVent Control
Panel, Delta3 spark arrestor if applicable, ductwork install, and the customer’s cell.
18. Record any parts that need to be fixed or replaced, if it cannot be done at that time.
Congratulations! Your unit is now fully commissioned and ready for operation.
Summary of Contents for Spire MLS-01-5500-10
Page 2: ......
Page 6: ......
Page 7: ...ROBOVENT SPIRE SERIES OWNER S MANUAL 7 SECTION 100 Important Safety Instructions ...
Page 9: ...SECTION 200 Glossary of Terms ...
Page 13: ...SECTION 300 Features of the Spire Series Collector ...
Page 18: ...18 ROBOVENT SPIRE SERIES OWNER S MANUAL ...
Page 19: ...SECTION 400 Receiving Inspection ...
Page 21: ...SECTION 500 Installation ...
Page 26: ...26 ROBOVENT SPIRE SERIES OWNER S MANUAL ...
Page 27: ...SECTION 600 Start up Commissioning ...
Page 31: ...SECTION 700 System Balancing ...
Page 39: ...SECTION 900 Maintenance ...
Page 52: ...52 ROBOVENT SPIRE SERIES OWNER S MANUAL ...
Page 53: ...ROBOVENT SPIRE SERIES OWNER S MANUAL 53 SECTION 1000 Troubleshooting ...
Page 58: ...58 ROBOVENT SPIRE SERIES OWNER S MANUAL ...
Page 59: ...APPENDIX A General Wiring Diagrams ...
Page 65: ...APPENDIX B Parts List ...
Page 66: ...B 2 ROBOVENT SPIRE SERIES OWNER S MANUAL APPENDIX B Parts List C D E F G M L K J I H A B ...