3 Connection and commissioning
Manual ENCO 08-M · EN05 · 2018, September 10th
28
3.5
Putting into operation
3.5.1
ENCO 08
This version (integrated in totalizer heads F and G)
does not require a local
parameterization
. The ENCO 08 is preset to the meter type with its specific data,
tested and sealed at the RMG factory by the certified test lab using the user
software.
During commissioning on site, only the connection (see connection examples)
between ENCO 08 and the connected readout device must be established. The
connection for the encoder is located on the back of the totalizer head (a plug from
the company Binder of the series 713: 1 = Vo + // 3 = Vo -).
3.5.2
ENCO 08-M
This version (external encoder) requires local parameterization. The ENCO 08-M
must be parameterized to its specific data for the meter type to which it is attached
(such as meter reading, decimal digits and direction of rotation) by means of the
user software. This separate manual "ENCO 08 - Programming Manual" can be
found in the help menu of the "ENCO08 PC Software". Here you will also find a
short manual for this "ENCO08 PC Software".
The ENCO 08-M can be used without restriction on all RMG turbine meters and
rotary displacement meters with mechanical output. The ENCO08-M can also be