Installation: Assembly, connection and start-up
27
In
st
al
la
tio
n
Starting up
Multi-family residence with three main bus lines and 2 door stations
Block diagram:
multi-family residence with three main bus lines and 2 door stations (central power feed).
Operation
Device
1. Switch on
Customer line safety switch
2. Deactivate adjustment protection
1)
1)
Deactivated by the contractor.
TwinBus power supply unit 1 7573
3. Programming the main doorbell
2)
2)
More information can be found in the indoor video station “Start-up” section starting on page
.
Assigning main door station and intercom units
4. Adjust door opening time
TwinBus power supply unit 1 7573, default value 3 s
5. Activate adjustment protection if
required
TwinBus power supply unit 1 7573
2x2+2
2x2+2
2x2+2
2x2+2
2x2+2
2x2+2
2x2+2
2x2+2
2x2+2
2x2+2
2x2+2
2
2
2
2
2
2
RiTTO
RiTTO
8
2
8
2
N
Summary of Contents for TWINBUS
Page 2: ...2 ...
Page 41: ...Installation Assembly connection and start up 41 Installation 00042 0 ...
Page 156: ...Installation Installation Assembly connection and start up 156 ...
Page 193: ...Notes 193 ...
Page 194: ...Notes 194 ...
Page 195: ...Notes 195 ...
Page 196: ...Notes 196 ...