Inst
alla
tion
Installation: Assembly, connection and start-up
138
2.8.4 Verrano glass door station 1 8301–1 8304, 1 8311–1 8314, 1 8321–1 8324 and
1 8331–1 8334
Assembly
Remove the unit and the supplied components from the packaging.
Frame installation
Plaster the flush-mounted frame after bending the two wall anchors at the left- and right-hand side.
1. Wall anchor
Note:
Observe the installation height for systems with a video camera.
Note:
The thickness of the plaster still to be applied must be taken into consideration for unplastered walls.
ca. 1,6 m
00615-0
t
h
b
00616-0
Summary of Contents for TWINBUS
Page 2: ...2 ...
Page 41: ...Installation Assembly connection and start up 41 Installation 00042 0 ...
Page 156: ...Installation Installation Assembly connection and start up 156 ...
Page 193: ...Notes 193 ...
Page 194: ...Notes 194 ...
Page 195: ...Notes 195 ...
Page 196: ...Notes 196 ...