Installation: Assembly, connection and start-up
29
In
st
al
la
tio
n
Starting up
Multi-family and office building with separate floor access door stations without internal
communication
Block diagram
multi-family and office building with separate floor access door stations without internal communication.
Operation
Device
1. Switch on
Customer line safety switch
2. Start device up
1)
1)
Optional.
TwinBus video line distributor 1 4813
3. Deactivate
2)
adjustment protection
2)
Deactivated by the contractor.
TwinBus power supply unit 1 7573
4. Activate door station
Door selector switch 1 4982
5. Programming the main doorbell
3)
3)
More information can be found in the indoor video station “Start-up” section starting on page
.
Assign door station and intercoms
6. Adjust door opening time
TwinBus power supply unit 1 7573, default value 3 s
7. Activate adjustment protection if
required
TwinBus power supply unit 1 7573
2x2
RiTTO
1 4783
1 4751
1 4760
8
RiTTO
1 4783
1 4753
1 4760
8
2x2
ET1
2x2
2x2
1 6477
2
1 6477
2
1 6477
2
2x2
a1
2x2
1 7573 1 4585
2
1 6477
UV
1 7855
1 7855
1 7855
1 7573 1 4813
2
1 6477
UV
B0074-2
Summary of Contents for TWINBUS
Page 2: ...2 ...
Page 41: ...Installation Assembly connection and start up 41 Installation 00042 0 ...
Page 156: ...Installation Installation Assembly connection and start up 156 ...
Page 193: ...Notes 193 ...
Page 194: ...Notes 194 ...
Page 195: ...Notes 195 ...
Page 196: ...Notes 196 ...