12
6.
Sign the bolt-hole point on the gate bracket and gate. Do this by placing a
punch or a sign in the middle of each bolt slot on the post bracket assemblies
and the gate bracket. It allows slight adjustments to the post bracket. Then
remove the post bracket and gate bracket by taking off the C-clamps.
7.
Drill 10.5 mm diameter holes through the post and the gate at the marked
locations.
8.
Attach the post bracket assemblies to
the gate posts by inserting M10 x
200 bolts through each post bracket assembly and the drilled holes in
the gate post. Fasten each bolt with one
¢
10 washer, one
¢
10 lock
washer, and one
¢
10 nut.
9.
Attach the gate brackets to each gate by inserting two M10 x 75 bolts
through the gate brackets and the drilled holes in the gates. Fasten each bolt
with one
¢
10 lock washer, and one
¢
10 nut.
10.
Cut off any part of the bolts that extend beyond the tightened nuts.
11.
With the gate opener fully retracted and with the gate in the fully open position (for Pull-to-Open installation)
or fully closed position (for Push-to-Open installation), attach the gate opener to the Post Bracket Assembly and
the Gate Bracket by inserting a clevis pin through the gate opener and the Post Pivot Bracket and another clevis
pin through the gate opener and the Gate Bracket. Secure each clevis pin with a hairpin clip.
Summary of Contents for GTR062
Page 12: ...15 Connection of the control board...
Page 21: ......