7.1 Driveline Length Check
When fitting the mower to the tractor, the telescoping driveline must be inspected to ensure that at its most
compressed position, the profiles do not “bottom out”, and when at its farthest extended position, there is
sufficient engagement between the profiles to operate safely. At its shortest length, there must be at least a 1”
clearance between each profile end and opposite profile universal joint. At its farthest operating extension, a
minimum profile engagement of 6” must be maintained for a Constant Velocity (CV) tube type driveline and a
minimum engagement of 6” for non-CV solid shaft drivelines.
7. DRIVELINE ATTACHMENT
The driveline yoke and tractor PTO shaft must be
dirt free and greased for attachment.
To connect the mower driveline to the tractor PTO
output shaft, pull the driveline yoke collar back and
align the grooves and splines of the yoke with those
of the PTO shaft. Push the driveline yoke onto the
PTO shaft, release the locking collar, and position
the yoke until the locking collar balls are seated
onto the PTO shaft. Push and pull the driveline
back and forth several times to ensure a secure
attachment.
OPS-R-0003_A
When attaching the Implement input driveline to the Tractor PTO, it is important that the
connecting yoke spring activated locking collar slides freely and the locking balls are seated
securely in the groove on the Tractor PTO shaft. Push and pull the driveline back and forth
several times to ensure it is securely attached. A driveline not attached correctly to the
Tractor PTO shaft could come loose and result in personal injury and damage to the
Implement.
(S3PT-17)
Before operating the Implement, check to make sure the Implement input driveline will not
bottom out or become disengaged. Bottoming out occurs when the inner shaft penetrates
the outer housing until the assembly becomes solid-it can shorten no more. Bottoming out
can cause serious damage to the Tractor PTO by pushing the PTO into the Tractor and
through the support bearings or downward onto the PTO shaft, breaking it off. A broken
driveline can cause personal injury.
(S3PT-18)
Summary of Contents for FN120
Page 2: ......
Page 10: ......
Page 11: ...Safety Section 1 1 2012 Alamo Group Inc SAFETY SECTION ...
Page 28: ...SAFETY FN180 FN120 07 12 Safety Section 1 18 2012 Alamo Group Inc SAFETY Decal Description ...
Page 29: ...SAFETY FN180 FN120 07 12 Safety Section 1 19 2012 Alamo Group Inc SAFETY ...
Page 30: ...SAFETY FN180 FN120 07 12 Safety Section 1 20 2012 Alamo Group Inc SAFETY ...
Page 31: ...SAFETY FN180 FN120 07 12 Safety Section 1 21 2012 Alamo Group Inc SAFETY ...
Page 32: ...SAFETY FN180 FN120 07 12 Safety Section 1 22 2012 Alamo Group Inc SAFETY ...
Page 33: ...SAFETY FN180 FN120 07 12 Safety Section 1 23 2012 Alamo Group Inc SAFETY ...
Page 34: ...SAFETY FN180 FN120 07 12 Safety Section 1 24 2012 Alamo Group Inc SAFETY ...
Page 35: ...SAFETY FN180 FN120 07 12 Safety Section 1 25 2012 Alamo Group Inc SAFETY ...
Page 36: ...SAFETY FN180 FN120 07 12 Safety Section 1 26 2012 Alamo Group Inc SAFETY ...
Page 37: ...SAFETY FN180 FN120 07 12 Safety Section 1 27 2012 Alamo Group Inc SAFETY ...
Page 39: ......
Page 65: ......
Page 91: ...Introduction Section 2 1 2012 Alamo Group Inc INTRODUCTION SECTION ...
Page 96: ......
Page 97: ...Assembly Section 3 1 2012 Alamo Group Inc ASSEMBLY SECTION ...
Page 106: ......
Page 107: ...Operation Section 4 1 2012 Alamo Group Inc OPERATION SECTION ...
Page 156: ......
Page 157: ...Maintenance Section 5 1 2012 Alamo Group Inc MAINTENANCE SECTION ...
Page 160: ...MAINTENANCE FN180 FN120 07 12 Maintenance Section 5 4 2012 Alamo Group Inc MAINTENANCE ...
Page 191: ......
Page 192: ...SEGURIDAD FN180 FN120 07 12 Sección de Seguridad 1 27 2012 Alamo Group Inc SEGURIDAD ...
Page 193: ...SEGURIDAD FN180 FN120 07 12 Sección de Seguridad 1 26 2012 Alamo Group Inc SEGURIDAD ...
Page 194: ...SEGURIDAD FN180 FN120 07 12 Sección de Seguridad 1 25 2012 Alamo Group Inc SEGURIDAD ...
Page 195: ...SEGURIDAD FN180 FN120 07 12 Sección de Seguridad 1 24 2012 Alamo Group Inc SEGURIDAD ...
Page 196: ...SEGURIDAD FN180 FN120 07 12 Sección de Seguridad 1 23 2012 Alamo Group Inc SEGURIDAD ...
Page 197: ...SEGURIDAD FN180 FN120 07 12 Sección de Seguridad 1 22 2012 Alamo Group Inc SEGURIDAD ...
Page 198: ...SEGURIDAD FN180 FN120 07 12 Sección de Seguridad 1 21 2012 Alamo Group Inc SEGURIDAD ...
Page 199: ...SEGURIDAD FN180 FN120 07 12 Sección de Seguridad 1 20 2012 Alamo Group Inc SEGURIDAD ...
Page 200: ...SEGURIDAD FN180 FN120 07 12 Sección de Seguridad 1 19 2012 Alamo Group Inc SEGURIDAD ...
Page 201: ...SEGURIDAD FN180 FN120 07 12 Sección de Seguridad 1 18 2012 Alamo Group Inc SEGURIDAD ...
Page 202: ...SEGURIDAD FN180 FN120 07 12 Sección de Seguridad 1 17 2012 Alamo Group Inc SEGURIDAD ...
Page 203: ...SEGURIDAD FN180 FN120 07 12 Sección de Seguridad 1 16 2012 Alamo Group Inc SEGURIDAD ...
Page 204: ...SEGURIDAD FN180 FN120 07 12 Sección de Seguridad 1 15 2012 Alamo Group Inc SEGURIDAD ...
Page 218: ...Sección de Seguridad 1 1 2012 Alamo Group Inc SECCIÓN DE SEGURIDAD ...
Page 219: ......