OPERATION
FN180/FN120 07/12
Operation Section 4-40
© 2012 Alamo Group Inc.
OPERA
T
ION
10.7 Shutting Down the Implement
To shut down attached mower head, first bring the
tractor to a complete stop. Decrease engine RPM
to idle then disengage cutterhead. The mower head
will come to a complete stop within a suitable
amount of time. Do not engage or disengage the
cutterheads at a high RPM unless there is an
emergency situation.
Park the tractor on a level surface, place the
transmission in park or neutral and apply the
parking brake, lower the attached implement to the
ground, shut down the engine, remove the key, and
wait for all motion to come to a complete stop
before exiting the tractor.
OPS-U- 0016
11. DISCONNECTING THE MOWER FROM THE TRACTOR
Before disconnecting the mower, the PTO must be disengaged and blade rotation at a complete stop. Move
the mower to a level storage location and lower the center section and both wings to the ground. If the mower
will be stored with the wings in the raised position, install both wing transport lock braces. If the mower is not
resting securely on the ground, block the mower up securely before attempting to disconnect it from the
tractor.
Use extreme care to keep feet and hands from under the mower and clear of any pinch points.
OPS-R-0030
Always shut the Tractor completely down, place the transmission in park, and set the
parking brake before you or anyone else attempts to connect or disconnect the Implement
and Tractor hitches.
(S3PT-15)
Summary of Contents for FN120
Page 2: ......
Page 10: ......
Page 11: ...Safety Section 1 1 2012 Alamo Group Inc SAFETY SECTION ...
Page 28: ...SAFETY FN180 FN120 07 12 Safety Section 1 18 2012 Alamo Group Inc SAFETY Decal Description ...
Page 29: ...SAFETY FN180 FN120 07 12 Safety Section 1 19 2012 Alamo Group Inc SAFETY ...
Page 30: ...SAFETY FN180 FN120 07 12 Safety Section 1 20 2012 Alamo Group Inc SAFETY ...
Page 31: ...SAFETY FN180 FN120 07 12 Safety Section 1 21 2012 Alamo Group Inc SAFETY ...
Page 32: ...SAFETY FN180 FN120 07 12 Safety Section 1 22 2012 Alamo Group Inc SAFETY ...
Page 33: ...SAFETY FN180 FN120 07 12 Safety Section 1 23 2012 Alamo Group Inc SAFETY ...
Page 34: ...SAFETY FN180 FN120 07 12 Safety Section 1 24 2012 Alamo Group Inc SAFETY ...
Page 35: ...SAFETY FN180 FN120 07 12 Safety Section 1 25 2012 Alamo Group Inc SAFETY ...
Page 36: ...SAFETY FN180 FN120 07 12 Safety Section 1 26 2012 Alamo Group Inc SAFETY ...
Page 37: ...SAFETY FN180 FN120 07 12 Safety Section 1 27 2012 Alamo Group Inc SAFETY ...
Page 39: ......
Page 65: ......
Page 91: ...Introduction Section 2 1 2012 Alamo Group Inc INTRODUCTION SECTION ...
Page 96: ......
Page 97: ...Assembly Section 3 1 2012 Alamo Group Inc ASSEMBLY SECTION ...
Page 106: ......
Page 107: ...Operation Section 4 1 2012 Alamo Group Inc OPERATION SECTION ...
Page 156: ......
Page 157: ...Maintenance Section 5 1 2012 Alamo Group Inc MAINTENANCE SECTION ...
Page 160: ...MAINTENANCE FN180 FN120 07 12 Maintenance Section 5 4 2012 Alamo Group Inc MAINTENANCE ...
Page 191: ......
Page 192: ...SEGURIDAD FN180 FN120 07 12 Sección de Seguridad 1 27 2012 Alamo Group Inc SEGURIDAD ...
Page 193: ...SEGURIDAD FN180 FN120 07 12 Sección de Seguridad 1 26 2012 Alamo Group Inc SEGURIDAD ...
Page 194: ...SEGURIDAD FN180 FN120 07 12 Sección de Seguridad 1 25 2012 Alamo Group Inc SEGURIDAD ...
Page 195: ...SEGURIDAD FN180 FN120 07 12 Sección de Seguridad 1 24 2012 Alamo Group Inc SEGURIDAD ...
Page 196: ...SEGURIDAD FN180 FN120 07 12 Sección de Seguridad 1 23 2012 Alamo Group Inc SEGURIDAD ...
Page 197: ...SEGURIDAD FN180 FN120 07 12 Sección de Seguridad 1 22 2012 Alamo Group Inc SEGURIDAD ...
Page 198: ...SEGURIDAD FN180 FN120 07 12 Sección de Seguridad 1 21 2012 Alamo Group Inc SEGURIDAD ...
Page 199: ...SEGURIDAD FN180 FN120 07 12 Sección de Seguridad 1 20 2012 Alamo Group Inc SEGURIDAD ...
Page 200: ...SEGURIDAD FN180 FN120 07 12 Sección de Seguridad 1 19 2012 Alamo Group Inc SEGURIDAD ...
Page 201: ...SEGURIDAD FN180 FN120 07 12 Sección de Seguridad 1 18 2012 Alamo Group Inc SEGURIDAD ...
Page 202: ...SEGURIDAD FN180 FN120 07 12 Sección de Seguridad 1 17 2012 Alamo Group Inc SEGURIDAD ...
Page 203: ...SEGURIDAD FN180 FN120 07 12 Sección de Seguridad 1 16 2012 Alamo Group Inc SEGURIDAD ...
Page 204: ...SEGURIDAD FN180 FN120 07 12 Sección de Seguridad 1 15 2012 Alamo Group Inc SEGURIDAD ...
Page 218: ...Sección de Seguridad 1 1 2012 Alamo Group Inc SECCIÓN DE SEGURIDAD ...
Page 219: ......