68
VPAP® III, VPAP III ST, VPAP III ST-A Service Manual
6 Add three R300-733 foam pads to the inside of the lower airpath. Position them as shown:
Fit cable tie and replace blower outlet connector
1 With the blower removed, position a 100 mm cable tie under the top set of terminals on the
power switch as shown below:
2 Fasten the cable tie around the wires and terminals so that they are bundled together.
1
2
3