7. Re-close and fasten the
connection flap.
8. Connect the unit to the power
supply.
9. Remove the control board cover.
10. Set the room humidity on the
control board (see commissioning).
11. Re-attach the control board
cover using the two screws.
12. Disconnect the unit from the
power supply.
13. Hang the SLE panel with LED
function into the top edge, use
the top guide pins to centre it and
then let it rest gently.
14. Angle the panel slightly
downwards and connect the plug
contact on the terminal block to
the plug contact on the panel.
15. Stow the cable in the
connection box.
16. Push the panel using the
bottom guide pins.
17. Tighten the two locks
clockwise so that the bottom of
the panel can no longer be lifted.
7. Closing the connection flap
13.-17. Putting the unit panel on
Plug contacts
Lock
8.-12. Control board
11