OPERATOR MAINTENANCE PROCEDURES
G2 DECONTAMINATION WATER HEATER
SERVICE UPON RECEIPT
INITIAL SETUP:
Personnel Required:
References
One
WP 0005, WP 0006, WP 0007, WP 0008
GENERAL
The following procedures are required to be performed by the operator in order to prepare the G2 Series
Decontamination Water Heater and its contents for use.
SITE SELECTION
To ensure minimal problems with set-up of the G2 Series Decontamination Water Heater
and good operation of
equipment being used in conjunction with it, ensure area is:
Dry and environmentally controlled
POWER REQUIREMENTS
The G2 Series Decontamination Water Heater requires an electrical supply of 110V, 15A grounded power supply to
operate.
SERVICE UPON RECEIPT
Inspect each Water Heater for damage incurred during shipment. If any damage is visible, notify supervisor. Report
the damage on SF361, Transportation Discrepancy Report. Check the equipment against the packing slip to see if
the shipment is complete. Report all discrepancies in accordance with applicable service instructions.
Refer to PMCS before placing the Water Heater in service.
INSTALLATION INSTRUCTIONS
To set up the G2 Decontamination Water Heater refer to WP 0005 of this TM for setup and pre-start procedures.
PRELIMINARY SERVICING OF EQUIPMENT
WARNING
Do not apply power to the water heater if it is not properly grounded to the
power source. Electrical shock can cause personnel injury or death and may
result in damage to equipment.
The G2 Decontamination Water Heater does require before operation service.
Daily and monthly checks are addressed in the PMCS tables located in WP
0013 of this TM.
END OF WORK PACKAGE