Operation & Maintenance w/IPB
G2 Series Decontamination Water Heater
0007
Part Number 1006375
0007-1
DHS SYSTEMS, LLC
This document contains information proprietary to DHS Systems LLC and is intended solely for use by its customers. No portion of this document may be reproduced
for release to a third party without written consent of DHS Systems LLC.
OPERATOR INSTRUCTIONS
G2 SERIES DECONTAMINATION WATER HEATER
G2 SERIES START-UP PROCEDURES
GENERAL
The following WP details the start-up, hot water operation and solution injector operation (G2-I and G2S-I Water
Heater Only) procedures of the G2 Series Decontamination Water Heater.
WARNING
INCORRECT OPERATION OF THIS WATER HEATER COULD RESULT IN
SERIOUS INJURY AND ORDAMAGETO THE EQUIPMENT. DO NOT
ALTER OR MODIFY THIS EQUIPMENT IN ANY MANNER.
START-UP PROCEDURES
NOTE
Ensure the injector bypass lever (G2-I and G2S-I Water Heater Only) is in the
OFF position.
1. Locate safety decals on the water heater and heed their warnings.
2. Fill the burner fuel tank with #1 or #2 fuel oil, diesel or kerosene.
3. Connect the power supply GFCI power cord into an 110V power supply, ensuring the outlet matches the plug on
the power cord.
NOTE
Prior to connecting the water supply source hose, ensure hose has been
flushed in accordance with WP 0006.
4. Connect the water supply hose to water source inlet of the water heater.
NOTE
Flush coil prior to connecting discharge hoses
5. Connect fresh water discharge hose (Black) and Decon solution discharge hose (Red) (G2-I and G2S-I Water
Heater Only) or another black hose(s) to the corresponding water discharges on the unit.
6. Connect the “male” end of the hose to the shower system (G2-I or G2S-I water Heater).
7. Turn the temperature control valve knob clockwise (CW), to the OFF position.
8. Open the water supply completely to charge the water heater.
9. Open the temperature control valve knob, counter-clockwise (CCW), until water begins to flow from the shower
heads (G2-I or G2S-I water Heater).
10. Allow the water to flow until all air is released from the system.
11. Once the system is in full flow, turn the power ON/OFF switch to the ON position.
END OF TASK