![Reechcraft PowerPole Operators Safety Manual Download Page 25](http://html1.mh-extra.com/html/reechcraft/powerpole/powerpole_operators-safety-manual_1430917025.webp)
www.reechcraft.com/PowerPole
888-600-6160
25
secti
On
3
ERECTING THE SYSTEM
11. Adjust the base plate and screw stabilizers so the mast assembly
is vertically plumb in all directions and the base plate is located
approximately .75 in. (19 mm) above the ground.
12. During this process, the top of the
mast assembly will “stick” slightly
to the structure. Pull the mast
assembly just away from the
structure to allow the mast assembly
to equalize itself and then set back
against structure.
ERECTING THE OUTRIGGER CONFIGURATION (cont’d)
Fig. 3.14
Fig. 3.15
Summary of Contents for PowerPole
Page 1: ...Operator s Safety Manual www reechcraft com powerpole P N 4026579...
Page 8: ...8 Section 1 GENERAL SYSTEM INFORMATION CLIMBING UNIT WITH PLATFORM SUPPORTS Fig 1 1 Fig 1 2...
Page 42: ...42 Section TRANSPORT STORAGE AND MAINTENANCE 7 inspection and Maintenance Logs...
Page 48: ...Reechcraft Inc 845 34th St N Fargo ND 58102 888 600 6160 www reechcraft com PowerPole...