ERECTING THE SYSTEM
6. Taking the elevation measurements of the 3 bearing positions, with
the mast assembly still on the ground, adjust the outrigger assembly
up or down on the mast as necessary and adjust the screw stabilizers
close to their final positions using a drill and the supplied nut driver.
ERECTING THE OUTRIGGER CONFIGURATION (cont’d)
Fig. 3.10
7. Position the climbing unit and mast assembly with the base close to
its final position. Lay down a stud board flat on the ground parallel
to the wall for a temporary wheel stop to aid in erection. Referring to
the layout plan, measure the distance the outrigger will be away from
the wall and place the board on the ground accordingly.
8. Based on the layout plan, determine the location of the V- brace
on the structure and adjust it accordingly while the assembly is on
the ground.
Fig. 3.11
Summary of Contents for PowerPole
Page 1: ...Operator s Safety Manual www reechcraft com powerpole P N 4026579...
Page 8: ...8 Section 1 GENERAL SYSTEM INFORMATION CLIMBING UNIT WITH PLATFORM SUPPORTS Fig 1 1 Fig 1 2...
Page 42: ...42 Section TRANSPORT STORAGE AND MAINTENANCE 7 inspection and Maintenance Logs...
Page 48: ...Reechcraft Inc 845 34th St N Fargo ND 58102 888 600 6160 www reechcraft com PowerPole...