ERECTING THE SYSTEM
3
9. Important: Before erecting the mast assembly into position, thoroughly
examine area from the ground up to be sure there are no electrical
lines or other obstructions that will interfere with the erection of the
assembly. By starting at the top end of the assembly, lift the assembly
and walk towards the structure until the wheels contact the 2” x 4” stop
board. Continue to lift and tilt the assembly upward into position while
walking toward the structure.
ERECTING THE OUTRIGGER CONFIGURATION (cont’d)
10. Take care in the final portion of erection as the lifting force becomes a
pulling force. Ease the mast assembly against the structure.
Fig. 3.13
Fig. 3.12
Summary of Contents for PowerPole
Page 1: ...Operator s Safety Manual www reechcraft com powerpole P N 4026579...
Page 8: ...8 Section 1 GENERAL SYSTEM INFORMATION CLIMBING UNIT WITH PLATFORM SUPPORTS Fig 1 1 Fig 1 2...
Page 42: ...42 Section TRANSPORT STORAGE AND MAINTENANCE 7 inspection and Maintenance Logs...
Page 48: ...Reechcraft Inc 845 34th St N Fargo ND 58102 888 600 6160 www reechcraft com PowerPole...