ERECTING THE SYSTEM
3
4. If the screw stabilizer positions are level or higher than the base plate
location, then the outrigger assembly will need to be repositioned
higher on the mast.
ERECTING THE OUTRIGGER CONFIGURATION (cont’d)
Fig. 3.9
5. If the change in elevation between each screw stabilizer exceeds 8
in (20 cm) the bearing surfaces of the screw stabilizers will need to be
cribbed or earth lowered accordingly. If ground conditions are
extreme, the installation may require the use of the optional all-terrain
outrigger conversion kit. Talk to your local dealer or call ReechCraft for
more information.
Summary of Contents for PowerPole
Page 1: ...Operator s Safety Manual www reechcraft com powerpole P N 4026579...
Page 8: ...8 Section 1 GENERAL SYSTEM INFORMATION CLIMBING UNIT WITH PLATFORM SUPPORTS Fig 1 1 Fig 1 2...
Page 42: ...42 Section TRANSPORT STORAGE AND MAINTENANCE 7 inspection and Maintenance Logs...
Page 48: ...Reechcraft Inc 845 34th St N Fargo ND 58102 888 600 6160 www reechcraft com PowerPole...