![Raven Sidekick Pro ISO Installation & Operation Manual Download Page 49](http://html.mh-extra.com/html/raven/sidekick-pro-iso/sidekick-pro-iso_installation-and-operation-manual_789032049.webp)
5
P/N 016-0171-509 Rev. E
45
OPERATION
FIGURE 1. Sidekick Pro™ ISO Pump Calibrator
4. Verify the following conditions are present:
a. Pump pressure less than 12 PSI [82.7 kPa]
b. Vacuum pressure for the injected product must be less than 5.5 PSI [37.92 kPa]
c. Injection product pump mode must be set to “CAL/PRI/RNS” (Calibrate/Prime/Rinse)
d. Injection pump product master switch must be set to on
5. On the UT display, set the pump mode on the main screen to “CAL/PRI/RNS.”
Remove Cover
Push Plunger
Down
Install
Cover
Calibration
Window
Tools
Summary of Contents for Sidekick Pro ISO
Page 8: ...CHAPTER 1 4 Sidekick Pro ISO Installation Operation Manual ...
Page 16: ...CHAPTER 2 12 Sidekick Pro ISO Installation Operation Manual ...
Page 46: ...CHAPTER 4 42 Sidekick Pro ISO Installation Operation Manual ...
Page 70: ...CHAPTER 7 66 Sidekick Pro ISO Installation Operation Manual ...
Page 80: ...Index 76 Sidekick Pro ISO Installation Operation Manual ...