![Raven AutoBoom XRT Calibration & Operation Manual Download Page 63](http://html.mh-extra.com/html/raven/autoboom-xrt/autoboom-xrt_calibration-and-operation-manual_788967063.webp)
P/N 016-0235-001 Rev. B
59
DIAGNOSTICS AND TROUBLESHOOTING
FIGURE 13. Target Velocity Test
TARGET POSITION TEST
This test is designed to test the boom control PID loop. Enter a target position several degrees away from the
current position. After running the test, various values will be reported. These values represent how quickly the
boom moved to the target position. Ideally, the Delay, Rise, Settling, and Overshoot values are low.
FIGURE 14. Target Position Test
Summary of Contents for AutoBoom XRT
Page 1: ...Copyright 2019 AutoBoom XRT Calibration Operation Manual P N 016 0235 001 Rev B 03 19 E32966 ...
Page 8: ...CHAPTER 1 4 AutoBoom XRT Calibration Operation Manual ...
Page 16: ...CHAPTER 3 12 AutoBoom XRT Calibration Operation Manual ...
Page 48: ...CHAPTER 5 44 AutoBoom XRT Calibration Operation Manual ...
Page 54: ...CHAPTER 6 50 AutoBoom XRT Calibration Operation Manual ...