Preparing for use
R&S
®
SMCV100B
19
Getting Started 1432.7046.02 ─ 04
b) Mount the adapter kit. Follow the assembly instructions provided with the
adapter kit.
2. Lift the R&S
SMCV100B to shelf height.
3. Push the R&S
SMCV100B onto the shelf until the rack brackets fit closely to
the rack.
4. Tighten all screws at the rack brackets with a tightening torque of 1.2
Nm to
secure the R&S
SMCV100B in the rack.
To unmount the R&S
SMCV100B from a rack
1. Loosen the screws at the rack brackets.
2. Bring the lifting equipment to shelf height.
3. Remove the R&S
SMCV100B from the rack.
4. If placing the R&S
SMCV100B on a bench top again, unmount the adapter kit
from the R&S
SMCV100B. Follow the instructions provided with the adapter
kit.
4.5
Considerations for test setup
Cable selection and electromagnetic interference (EMI)
Electromagnetic interference (EMI) can affect the measurement results.
To suppress electromagnetic radiation during operation:
●
Use high-quality shielded cables, especially for the following connector types:
– BNC
Double-shielded BNC cables.
How to:
"To connect to non-screwable connectors (BNC)"
– USB
Double-shielded USB cables.
How to:
Chapter 4.9, "Connecting USB devices"
See also chapter "Measuring USB cable quality" in the user manual.
– LAN
At least CAT6 STP cables.
How to:
Chapter 4.7, "Connecting to LAN"
Considerations for test setup