WinLink 1000 Installation and Operation Manual
Chapter 4 Operation
4.2
Operating WinLink 1000
Turning On WinLink 1000
Î
To turn on WinLink 1000:
•
Connect the AC/DC converter to the IDU-E power connector and to
the mains; or -48VDC from rack or AC 110-240VAC.
The PWR indicator lights up and remains lit as long as the IDU is
receiving power.
WinLink 1000 requires no operator attention once installed, with the
exception of occasional monitoring of front panel indicators and
statistics data. Intervention is only required when WinLink 1000 must
be configured to its operational requirements, or diagnostic tests are
performed.
Operating WinLink 1000
4-3
Summary of Contents for WinLink 1000
Page 2: ......