Installing WinLink 1000 Units
1
Quick Start Guide
Installation of WinLink 1000 should be carried out only by a qualified
technician. If you are familiar with WinLink 1000, use this guide to
prepare the units for operation.
1.
Installing WinLink 1000 Units
ODU Package Contents:
•
ODU
•
Mast/Wall mounting kit
•
WinLink 1000 Management software installation CD
•
Mounting instructions
•
Spare RJ-45 connector
•
ODU to IDU cable at length ordered (optional)
IDU-E Package Contents:
•
IDU-E
•
110V/240V adaptor
•
IDU wall-mounting drilling template
•
Spare RJ-45 connector
(Optional) IDU-C Package Contents:
•
IDU-C
•
For AC model, 110v/240 VAC with 3-prong connector cable
•
For DC model, -48 VDC with 3-pin terminal block connector (green)
•
IDU standard 1-U, 19” carrier rack
•
Spare RJ-45 connector
Equipment Required:
•
RJ-45 crimp tool (If pre-assembled cable is not used)
Summary of Contents for WinLink 1000
Page 2: ......