
2.
Install antenna (Section 6.2, “Antenna mounting”).
3.
Install feed line (Section 6.3, “Antenna feed line”).
4.
Ensure proper grounding (Section 6.4, “Grounding”).
5.
Run cables and plug-in all connectors except from the SCADA equipment (Section 4.2,
“Connectors”)
6.
Apply power supply to RipEX
7.
Test radio link quality (Section 5.5, “Functional test”).
8.
Check routing by the ping tool (the section called “Ping”) to verify accessibility of all IP ad-
dresses with which the unit will communicate.
9.
Connect the SCADA equipment
7.
Test your application
RipEX Radio modem & Router – © RACOM s.r.o.
8
Getting started