19
INSTALLATION INSTRUCTIONS
DD
EE
FF
GG
CONNECT POWER WIRES
35. Permanently connect the Power (red), Ground (black) and
Ignition (white) Wires to main power (DD)
by connecting the
red wire to a constant 12V source through the supplied 20-
amp fuse (or SAE approved equivalent).
36.
Connect the white wire to an ignition activated 12V source
through the supplied 10-amp fuse (or SAE approved
equivalent).
37.
Connect the black wire to the chassis ground.
All ground locations
MUST
be free of paint, corrosion and
moisture with less than .1-ohm resistance to the negative
terminal of the vehicle battery. Contact the vehicle OEM
of Van Conversion Company if you have difficulty locating
proper power and grounding sources.
ELECTRONIC CONTROL MODULE (ECM)
38.
Permanently connect Docking Base Wire Harness and the
3 Pin Wire Harness to the Electronic Control Module (ECM)
(
EE
).
39.
Mount Electronic Control Module (ECM) behind dash panel
with 4 screws (provided) or with double-sided adhesive tape
placed on the back of the ECM (
FF
).
Double-sided adhesive tape MUST be able to withstand
high and low temperatures and be fire proof.
INSTALL DASH CONTROL
40.
Connect the Dash Control to the Electronic Control Module
(ECM) (
GG
).
White - Ignition Wire
Red - Power Wire
Black - Ground Wire
Connected Power Wires
Connected
Connected
Connected Power Wires
Connected
Connected