Safety
UM Pallet stacker Prmk10-PS v2.0 EN
21
Observe all relevant legislation, regulations, instructions and precautions with
regard to health and safety when dismantling the pallet stacker.
Observe all relevant legislation, regulations, instructions and precautions with
regard to the disposal of products in the environment.
Overload test
Before first putting into service, a static and dynamic overload test on the machine must be
carried out. See for details the user manuals of the Prorunner mk10 machines.
A new static and dynamic overload test may be necessary after complete disassembly of the
machine or after replacing critical parts.