SECTION 5
Pronar RC2100-2
5.21
with the system components. It is recommended to use preparations commercially available
designed to facilitate detecting air leaks. Damaged components should be replaced or
repaired. If leaks appear at connections then tighten the connections. If air continues to
escape, replace connection components or seals with new ones.
Check system tightness:
•
after travelling the first 1,000 km,
•
each time after making repairs or changing system components,
•
annually.
Visual inspection of the system
During tightness inspection attention should additionally be given to technical condition and
degree of cleanness of the system components. Contact of pneumatic conduit seals etc. with
oil, grease, petrol etc. may cause damage and accelerate the ageing process. Bent,
permanently deformed, cut or worn conduits should be replaced.
Visual inspection of the system
•
Conduct inspection of system at the same time as when checking tightness.
ATTENTION
Repair, exchange or regeneration of pneumatic system components may only be
performed in a specialised workshop.
Summary of Contents for RC2100-2
Page 2: ......
Page 6: ......
Page 10: ...5 11 TROUBLESHOOTING 5 31 ...
Page 11: ...SECTION 1 BASIC INFORMATION ...
Page 24: ...PRONAR RC2100 2 SECTION 1 1 14 ...
Page 25: ...SECTION 2 SAFETY ADVICE ...
Page 40: ...Pronar RC2100 2 SECTION 2 2 16 FIGURE 2 3 Locations of information and warning decals ...
Page 41: ...SECTION 3 DESIGN AND OPERATION ...
Page 59: ...SECTION 4 CORRECT USE ...
Page 78: ...Pronar RC2100 2 SECTION 4 4 20 ...
Page 79: ...SECTION 5 MAINTENANCE ...
Page 110: ...Pronar RC2100 2 SECTION 5 5 32 FIGURE 5 12 Lubrication points part 1 ...
Page 111: ...SECTION 5 Pronar RC2100 2 5 33 FIGURE 5 13 Lubrication points part 2 ...
Page 119: ...NOTES ...
Page 120: ... ...
Page 121: ...ANNEX A Tyre dimensions LP TYRES WHEEL RIM 1 215 75 R17 5 135 133 J 17 5x6 75 ...