
Pronar PT510
SECTION 4
4.24
FIGURE 4.6
Chute
(1) chute slide gate, (2) chute, (3) lever, (4) locking bolt
The rear load box wall is equipped with the chute slide gate (1) – figure (4.6) and chute
opening (2) (additional equipment) for unloading bulk materials. Chute design allows very
accurate dosing of the material to packaging (sacks, boxes etc.).
The opening gap can be controlled using lever (3). In order to do that loosen the bolt
interlocking slide gate (4), open the slide as required and lock again using the bolt. When
unloading through the chute do not open wall locks or wall extension locks and tipping of the
load box must be done very slowly and without jerking. Raising the load box quickly will exert
large pressure on the rear part of the load box due to displacement of the carried material
and could compromise trailer's stability.
While unloading high-volume materials be especially careful. Do NOT tip load box on uneven
or wet ground and move and jerk trailer during unloading. Bulky materials are normally
Summary of Contents for PT510
Page 2: ......
Page 6: ......
Page 7: ...SECTION 1 BASIC INFORMATION ...
Page 22: ...Pronar PT510 SECTION 1 1 16 ...
Page 23: ...SECTION 2 SAFETY ADVICE ...
Page 41: ...SECTION 2 Pronar PT510 2 19 FIGURE 2 3 Locations of information and warning decals ...
Page 42: ...Pronar PT510 SECTION 2 2 20 ...
Page 43: ...SECTION 3 DESIGN AND OPERATION ...
Page 64: ...Pronar PT510 SECTION 3 3 22 ...
Page 65: ...SECTION 4 CORRECT USE ...
Page 93: ...SECTION 5 MAINTENANCE ...
Page 120: ...Pronar PT510 SECTION 5 5 28 FIGURE 5 10 Trailer s lubrication points part 1 ...
Page 121: ...SECTION 5 Pronar PT510 5 29 FIGURE 5 11 Trailer s lubrication points part 2 ...
Page 131: ...NOTES ...
Page 132: ... ...