7.1 Installation details
Fully filled with water
Ensure that the UV system is fully filled with water
and water is flowing through it when operating with
the UV lamp switched on.
II.
635 mm
200 mm
I.
1.
2.
3.
4.
5.
6.
7.
8.
9.
A2139
Fig. 46: Vertical installation of the UV system
I. Side view
II. Front view
1. Bleed valve, provided on site
2. Flow of water to pool
3. Shut-off valve, open in normal operation
4. UV System
5. UV feed and drain pipe has to be 3 ... 5 times the
diameter of the pipe
6. Service area, keep free of obstacles
7. Shut-off valve, open in normal operation
8. Flow of water from filter
9. Shut-off valve, closed in normal operation
Vertical installation
Assembly and installation
51