
PACKER
SM-PSPC5-01-E/12-2007
SERVICE MANAUL PSPC5
Page 45 of 73
MAIN DRIVE CHAIN TENSION
The chain tensioner (30) of the main chain is
spring loaded. Because of the position of the
fixation bolts (31), when the tensioner is
completely to the right it is still possible to push
in the tensioner with 10 mm (by the chain).
When the chain tension is too low move the
complete chain tensioner to the left.
To release the chain tension, take out the lock
pin (32) from the rear of the tensioner, push
the green chain tensioner in and place the lock
pin into the lock hole (33).
LOOSEN UP TAPER LOCKS
To loosen up the connection between a taper
lock and a shaft, loosen up all 5 bolts (40)
approximately 5 mm. Remove 2 bolts
completely and place them into the threaded
holes (41). Tighten up those 2 bolts to loosen
the connection with the shaft.
TIGHTEN UP TAPER LOCKS
Tighten up the bolts crosswise. Do this step by
step. As soon as a bolt is a bit tight, tighten up
the next bolt according to the following order:
1-3-5-2-4-1 (see alongside drawing).
30
31
32
33
40
41
Summary of Contents for PSPC5
Page 2: ......
Page 4: ......
Page 7: ...INTRODUCTION SM PSPC5 01 E 12 2007 SERVICE MANAUL PSPC5 Page 7 of 73 INTRODUCTION...
Page 14: ......
Page 15: ...SAFETY SM PSPC5 01 E 12 2007 SERVICE MANAUL PSPC5 Page 15 of 73 1 SAFETY...
Page 20: ......
Page 21: ...INSTALLATION SM PSPC5 01 E 12 2007 SERVICE MANAUL PSPC5 Page 21 of 73 2 INSTALLATION...
Page 37: ...PACKER SM PSPC5 01 E 12 2007 SERVICE MANAUL PSPC5 Page 37 of 73 4 PACKER...
Page 52: ......
Page 53: ...OUTPUT CONVEYOR SM PSPC5 01 E 12 2007 SERVICE MANAUL PSPC5 Page 53 of 73 5 OUTPUT CONVEYOR...
Page 58: ......
Page 64: ......
Page 70: ......