INSTALLATION
Page 22 of 73
SERVICE MANUAL PSPC5
SM-PSPC5-01-E/12-2007
SAFETY REGULATIONS
Before starting to install or work on the system first read the chapters
TRANSPORT
For the safety of the installation and personnel, the following points are of importance:
- Use qualified and authorized personnel to carry out the transport and installation.
- Use approved tools, materials, hoisting- and lifting equipment.
- Use tools and materials that meet the measurement and weight of the parts.
- Use hoisting and lifting equipment that meet the format and the weight of the parts.
- Ensure that the paddles of fork trucks are of the right length and distance.
- Affix the paddles of the fork truck to the placed provided.
- Ensure that nothing can move unexpectedly.
- Make sure there is nobody under raised parts
- Some parts may have a high-leveled center of gravity and have the danger of tipping over.
STORAGE
On arrival the machine must be checked immediately for damages. Damages
must be reported to the Transport Company and to Prinzen.
Remove the packing material environmentally friendly.
When the machine must be stored for some time, the following precautions must
be taken:
- Store the machine in a dry room.
- Use a covering suitable for the local weather conditions.
- Do not expose the system to the sun
- Close off any openings
- Ensure that the module or part is rigid and cannot be moved or fall
- Protect the machine against the possibility of collision.
- Take preventive actions against vermin.
Thoroughly clean and inspect the system for damages after a period of storage
before installation of the system.
ASSEMBLY AND INSTALLATION
The assembly and installation must be carried out by personnel of Prinzen, or by engineers assigned
by Prinzen, trained for this purpose. They also see to initial operation of the installation and the
training of the operators.
Summary of Contents for PSPC5
Page 2: ......
Page 4: ......
Page 7: ...INTRODUCTION SM PSPC5 01 E 12 2007 SERVICE MANAUL PSPC5 Page 7 of 73 INTRODUCTION...
Page 14: ......
Page 15: ...SAFETY SM PSPC5 01 E 12 2007 SERVICE MANAUL PSPC5 Page 15 of 73 1 SAFETY...
Page 20: ......
Page 21: ...INSTALLATION SM PSPC5 01 E 12 2007 SERVICE MANAUL PSPC5 Page 21 of 73 2 INSTALLATION...
Page 37: ...PACKER SM PSPC5 01 E 12 2007 SERVICE MANAUL PSPC5 Page 37 of 73 4 PACKER...
Page 52: ......
Page 53: ...OUTPUT CONVEYOR SM PSPC5 01 E 12 2007 SERVICE MANAUL PSPC5 Page 53 of 73 5 OUTPUT CONVEYOR...
Page 58: ......
Page 64: ......
Page 70: ......