
SAFETY
Page 16 of 73
SERVICE MANUAL PSPC5
SM-PSPC5-01-E/12-2007
GENERAL
Only persons meeting the following requirements are authorized to work with the system. These
persons should be:
- Skilled and specifically trained for their duties.
- Familiar with the contents of this manual.
- Familiar with the locations of the emergency buttons and other safety devices.
- 18 years old or above.
- Familiar with the national and regional regulations regarding safety.
These persons should have reached the minimum legal age required to perform this work.
These persons are NOT under influence of any drug, medicine or alcoholic drink.
The system is designed for packing eggs into specific packaging. Any other use of the system is not
permitted.
SAFETY INSPECTION PROCEDURE
Before starting any adjustments and after finishing an adjustment job, make sure that all protective
covers are in place, all lockable doors are closed and locked, all covers are closed and the emergency
button operates correct. Check the emergency button to assure proper operation.
1. Push the emergency button.
2. Push the start button, the machine should not start.
3. Turn emergency button clockwise to release it.
4. Make sure that the machine does not start when the emergency button is pressed.
If the machine operates when the emergency button is pressed, this machine is not safe to operate.
Immediately repair the defective emergency button.
Make sure all warning labels are legible and are not damaged or removed. Replace them immediately
when necessary.
Summary of Contents for PSPC5
Page 2: ......
Page 4: ......
Page 7: ...INTRODUCTION SM PSPC5 01 E 12 2007 SERVICE MANAUL PSPC5 Page 7 of 73 INTRODUCTION...
Page 14: ......
Page 15: ...SAFETY SM PSPC5 01 E 12 2007 SERVICE MANAUL PSPC5 Page 15 of 73 1 SAFETY...
Page 20: ......
Page 21: ...INSTALLATION SM PSPC5 01 E 12 2007 SERVICE MANAUL PSPC5 Page 21 of 73 2 INSTALLATION...
Page 37: ...PACKER SM PSPC5 01 E 12 2007 SERVICE MANAUL PSPC5 Page 37 of 73 4 PACKER...
Page 52: ......
Page 53: ...OUTPUT CONVEYOR SM PSPC5 01 E 12 2007 SERVICE MANAUL PSPC5 Page 53 of 73 5 OUTPUT CONVEYOR...
Page 58: ......
Page 64: ......
Page 70: ......