
Installation and operator’s manual
Page 56 of 65
PVI-2000-OUTD-AU Rev.: 1.0)
7
TROUBLESHOOTING
AURORA inverters comply with standards set for grid-tied operation, safety and
electromagnetic compatibility.
Before being delivered by Power-One, the product has undergone successfully to
several tests to check: operation, protective devices, performance and durability.
All these tests, together with the system ensuring Power-One quality, guarantee an
optimal operation of AURORA.
However, should any malfunction of the photovoltaic system arise, solve problems as
follows:
9
Work under safe conditions as stated in chapter 3.5 and following. Make sure that
the connections between AURORA, the photovoltaic field and power distribution
grid have been made correctly.
9
Carefully observe which LED is blinking and read the signal appearing on the
display; then, following the instructions given in chapters 5.4 and 5.5 try to
identify the type of fault found.
If the malfunction cannot be removed by following these instructions, contact the
service centre or the installer (see following page).