
Installation and operator’s manual
Page 4 of 65
PVI-2000-OUTD-AU Rev.: 1.0)
USEFUL INFORMATION ON SAFETY STANDARDS
FOREWORD
¾
The installation of AURORA must be performed in full compliance with national
and local standards and regulations.
¾
AURORA has no internal user serviceable parts other than fuses.
For any maintenance or repair please contact the nearest authorized repair centre.
Please contact your reseller if you need to know the nearest authorised repair
centre.
¾
Read and understand all the instructions contained in this manual and become
familiar with the safety symbols in the relevant paragraphs before you install and
commission the equipment.
¾
The connection to the distribution grid must be done only after receiving approval
from the distribution utility as required by national and state interconnection
regulations, and can be done only by qualified personnel.
¾
Cover the photovoltaic panels with dark opaque sheets before they are connected
to avoid any chance of high voltages appearing at the connecting wire
terminations.