Installation | Assembly Instructions
48
Cooling Pad | Installation and Operation Guide Rev B | Doc P/N: 080205039E
Step 11: Assembling Water Inlet and Float
27
49
62
1.
and attach the
socket (62) to the 90° elbow (49)
2.
and attach the
float (27) to the 90° elbow (49)
62
28
4.
and attach the
90° elbow (28) to the socket (62)
73 mm
400 mm
3.
Drill a 25 mm hole
in the reservoir channel
side view
WWW