Installation | Assembly Instructions
36
Cooling Pad | Installation and Operation Guide Rev B | Doc P/N: 080205039E
Step 4: Placing the Support Trays
7
2.
Place the support trays (7)
on the reservoir channel
3.
Verify that the end of the
support tray is aligned with the
edge of the wall opening
1.
Connect CPAD side frame lower
fixations (26) to two end support
trays (7) using self-drilling screws (46)
7
46
26
WWW