Installation | Assembly Instructions
44
Cooling Pad | Installation and Operation Guide Rev B | Doc P/N: 080205039E
23
9.
Place the maintenance lid (23)
on the reservoir channel
52
48
51
8.
Attach the handle (48) to
the maintenance lid using two
screws (51) and two nuts (52)
WWW
Operation
Instructions
Technical
Specifications
Troubleshooting
Preventive
Maintenance
Installation
Introduction
Safety