Installation | Assembly Instructions
41
Cooling Pad | Installation and Operation Guide Rev B | Doc P/N: 080205039E
70
47
46
17
46
4.
Using a level, attach a support
bracket (47) to the wall with an
anchor (70) every 1500 mm
5.
Attach the gutter to
the support bracket with
self-drilling screws (46)
A
1500 mm
250 mm
Wall
opening
edge
NOTES:
▪
Verify that the edge of the gutter is in line with
the edge of the wall opening
▪
The upper frame and reservoir channel must
be perfectly aligned. If needed, install spacers
between the wall and the support brackets
70
1950 mm
NOTE:
For 1800 mm pads, drill the support bracket
anchor (70) holes 1950 mm from the bottom
of the support tray. For 1500 mm pads, drill
the support bracket anchor holes 1650 mm
from the bottom of the support tray