Installation | Assembly Instructions
30
Cooling Pad | Installation and Operation Guide Rev B | Doc P/N: 080205039E
Step 1: Installing the Reservoir Channel Supports
70 cm
NOTES:
▪
When a metal frame is used, the system
is supplied with M8 hex head screws,
washers, and nuts instead of anchors
▪
This step, and the parts used to mount the
reservoir channel, may vary according to
the final prepared structure
1
70
1.
Attach the reservoir channel
supports (1) using one anchor
(70) through the center slot
1
70
3.
Drill and insert two anchors through
the upper and lower holes of the reservoir
channel support to fully secure it
2.
Adjust the channel supports
vertically to achieve a 0.1% slope
towards the pump
0.1 %
Slope
WWW