Installation | Assembly Instructions
40
Cooling Pad | Installation and Operation Guide Rev B | Doc P/N: 080205039E
Step 7: Mounting Upper Frame
NOTE:
Only the hood which is
placed against the wall is
installed in this step
18
46
50 cm
70 mm
3.
Attach the upper hood (18)
to the gutter using self-drilling
screws (46) every 50 cm
46
17
1.
Drill a 35 mm hole into the
cooling pad side end corner (17)
and attach it to end of the gutter
using self-drilling screws (46)
2.
Repeat step 1 on the
other end of the gutter
25 mm
WWW