7-1. Initial Power Up Inspection
7. System Configurations
After the power is first applied to a dome it will perform a self-test procedure. This calibrates and checks the basic
functions of the dome; control is not possible during this self-test period. Once the camera has stopped moving, it
will then be ready to control if preset positions and tours have been programmed into a dome and the power is
turned off, the dome will enter the Auto Scan mode once the power is turned on again (after self-test period). The
dome will remain in Auto Scan until and operator cancels it.
56
Summary of Contents for 261 series
Page 1: ......
Page 12: ...3 1 Indoor Installation Structural Drawing 3 Installation 12 ...
Page 13: ...3 2 Outdoor Installation Structural Drawing Pendant Mounting 13 ...
Page 14: ...3 3 Embedded Mounting False Ceiling 14 ...
Page 15: ...15 ...
Page 17: ...3 4 Attached Mounting Fixed Ceiling 17 ...
Page 19: ...3 5 Pendant Mounting External Housing 19 ...
Page 20: ...20 ...
Page 21: ...21 ...
Page 23: ...23 ...